Complete renovation of the exterior façade and retrofit of the building. The exterior and interior was completely demolished. Work included:
- New footing and new framing where needed
- Installed barrel tile to match existing style
- Reproduced all metal and historical elements
- Rebuilt old cornice from 2nd floor to roofline
- New staircase and elevator
- New electrical, sewer and water pipes
- New bathrooms on 1st and 2nd floor
|