top of page

Complete retrofit of storage facility to fully operating commercial space.
DC Construction was contracted to do the following work:
1,700 sq. ft. interior and exterior space
New platform and structural support
Brought in all new utility lines
Complete HVAC system
New MEPs and Sprinkler System
Utilized existing features and modified into design aspects
High end, modern finishes throughout
State-of-the-Art Teller’s protective security panel and door
Bullet Proof Glass
Ballistic Shields
Utilized existing features and modified into design aspects
bottom of page